Atrium hanging installation
Hanging installations that fill a tall atrium void.
Overview
Atrium work is about the void, not the object: suspension geometry, sight lines from every floor and how the piece moves if it is allowed to. Weight and access determine whether rigging can use existing structure.
When to choose it
Atrium installations are chosen to give a tall space a deliberate centre, usually visible from several floors at once. They suit malls, hotels and corporate buildings with genuine volume. The defining constraint is that the piece is seen from above, below and every side simultaneously, so it must work as a three-dimensional object rather than as a facade, and it must be maintainable at height.
How it is made
The piece is designed from the sightlines of every level first, then detailed, because a sculpture designed for the ground floor reads poorly from the fourth. Suspension and fixing are engineered against the structure's actual capacity, with the loads and the redundancy agreed with the engineer. Assembly is planned to use the building's own methods - typically a crane or a working platform in the atrium void - with the sequence decided before fabrication. Maintenance access is designed in from the beginning, since reaching the piece later is the hardest part of the whole job.

Typical specifications
| Typical size | 3-20 m drop, across voids up to 30 m wide |
|---|---|
| Weight | Kept low by design; suspension loads verified against the structure |
| Lead time | 5-10 weeks |
| Access | Installed from MEWP, scaffold or rope access |
Typical applications
- Mall and hotel atria
- Airport and station halls
- Museum voids
- Corporate buildings
- Theatre foyers
What goes wrong on site
- Designing for eye level and discovering the piece is mostly seen from four floors up.
- Under-engineering the suspension, or assuming the ceiling capacity without confirming it with the building's engineer.
- Leaving maintenance access unresolved, which makes every future bulb change a major operation.
Before an overseas project starts
All sightlines
Send plans and photographs of every level that overlooks the void. The piece is designed to those, not to the ground-floor view.
Structural capacity
Suspension loads must be confirmed against the building's design. Tell us who holds that information.
Installation method
How the venue allows access to the void - crane, platform, or nothing - determines the build sequence.
Questions buyers ask
Can the existing ceiling carry the load?
That has to be verified, not assumed. We calculate suspension loads and check them against the building structure with the facility team before design is fixed.
How is it cleaned in a tall void?
By planning it in: chosen materials are either low-dust, cleanable by extended pole from a gantry, or designed to be lowered as complete modules.
How a project runs
- 1. EnquirySend photographs, drawings or a 3D file with approximate dimensions and your target date. A short written brief is enough to start.
- 2. Technique recommendationWe come back with the technique that fits your substrate, viewing distance and budget, plus the alternatives we rejected and why.
- 3. Sample and quotationA colour or material sample where relevant, and a costed quotation split into material, labour, finishing, packing and freight.
- 4. ProductionWork proceeds in our own workshop with dated progress photographs at agreed milestones.
- 5. Packing and shippingCrated and marked to your forwarder's requirements, with the full export document set prepared in advance.
- 6. Installation or handoverOur own crew installs on site, or we supply a fixing method statement and supervise your contractor locally.
Packing, shipping and export
Overseas projects are normal work for us, and packing is designed for the journey rather than added afterwards. Components are numbered against a packing list so assembly on site follows the drawings.
- Export plywood crates with foam blocking, desiccant and heat-treated (ISPM 15) timber
- Each crate marked with the shipping mark, crate number, gross and net weight and handling symbols
- Packing list keyed to the assembly drawings, so parts are identifiable on arrival
- Full document set: commercial invoice, packing list, certificate of origin and fumigation certificate
- Delivery on EXW, FOB, CIF or DDP terms depending on your forwarder arrangements
- Container loading plan supplied for large or irregular items, with a photo record of loading
Commercial terms
| Payment | Deposit on order, balance before shipment; T/T or as agreed in the contract |
|---|---|
| Currency | RMB or USD, invoiced in the agreed currency |
| Validity | Quotations held for 30 days unless stated otherwise |
| Scope basis | Material, labour, finishing, packing and freight quoted as separate lines |
| Changes | Variations priced in writing before the work proceeds |
| Warranty | Defects against workmanship and material failure within the agreed warranty period |
Quality control
- Dimensional and finish checks at each production milestone, not only at the end
- Dated progress photographs sent to the client throughout production
- Pre-shipment assembly trial for multi-part pieces, so site fit is verified before dispatch
- Third-party inspection welcome; we will prepare the access and documentation needed
- Written handover with material and colour records, so later repairs can be matched
Other techniques in this capability
Groundscape & scene installation
Groundscape and full-scene installations that visitors walk through.
Read guide →Light-art installation
Light-art installations built around the light source, not the object.
Read guide →Interactive sensor installation
Interactive installations driven by sensors, gesture or sound.
Read guide →All Visual Merchandising & Installations techniques · Full capability page · Complete technique library
Need this technique on your project?
Send the brief, approximate dimensions and destination. We will come back with a technique recommendation and a reference price band.
Request a quoteHow export works