Groundscape & scene installation
Groundscape and full-scene installations that visitors walk through.
Overview
Groundscape changes how a floor is used: it creates a route, a photo point and a reason to slow down. Because people walk on it, wear, slip resistance and cleaning matter as much as the visual effect.
When to choose it
Immersive installations wrap the visitor in the work rather than presenting it at a distance, and they are chosen where experience and dwell time matter more than display. They suit exhibitions, brand experiences, attractions and cultural spaces. The design responsibility is broader than in conventional installation: circulation, safety, capacity and the visitor's sightline and comfort are all part of the work.
How it is made
The experience is designed as a sequence with entry, progression and exit, and the visitor's route and pace are planned rather than left to chance. Light, sound, surface and sometimes scent are coordinated as one system, because an immersive room fails if any one element is designed in isolation. Materials are specified for the contact they will receive, and circulation and capacity limits are resolved with the venue's safety requirements. The technical systems are designed for access and servicing, since immersive work is maintained continuously while it runs.

Typical specifications
| Typical size | 50-2,000 m2 |
|---|---|
| Surface | Printed vinyl, carpet, timber or resin over the existing floor |
| Safety | Slip rating and fire rating certified for the intended use |
| Lead time | 3-8 weeks |
Typical applications
- Mall and retail circulation
- Exhibition and museum floors
- Event venues
- Tourist attractions
- Hotel public areas
What goes wrong on site
- Designing the visuals and the lighting separately, which is the most common reason immersive rooms feel unresolved.
- Ignoring circulation and capacity, so the space either bottlenecks or feels empty depending on the hour.
- Building technical systems into places that cannot be reached, in an installation that will need routine maintenance throughout its run.
Before an overseas project starts
Visited sequence
Tell us the entry, the intended progression and the exit. Immersive work is a route, not a room.
Safety and capacity
Confirm circulation widths, capacity limits and the venue's safety requirements. They shape the design at concept stage.
Run length and servicing
How long it runs and who maintains it. Systems designed for access cost less to keep alive.
Questions buyers ask
Will the floor surface be damaged by trolleys and cleaning machines?
It depends on the system chosen. We specify harder-wearing options for service routes and keep delicate materials to areas that are visually supervised.
How long does installation take?
Most groundscapes are installed overnight in sections over several nights, so the mall or venue never loses its circulation area during trading hours.
How a project runs
- 1. EnquirySend photographs, drawings or a 3D file with approximate dimensions and your target date. A short written brief is enough to start.
- 2. Technique recommendationWe come back with the technique that fits your substrate, viewing distance and budget, plus the alternatives we rejected and why.
- 3. Sample and quotationA colour or material sample where relevant, and a costed quotation split into material, labour, finishing, packing and freight.
- 4. ProductionWork proceeds in our own workshop with dated progress photographs at agreed milestones.
- 5. Packing and shippingCrated and marked to your forwarder's requirements, with the full export document set prepared in advance.
- 6. Installation or handoverOur own crew installs on site, or we supply a fixing method statement and supervise your contractor locally.
Packing, shipping and export
Overseas projects are normal work for us, and packing is designed for the journey rather than added afterwards. Components are numbered against a packing list so assembly on site follows the drawings.
- Export plywood crates with foam blocking, desiccant and heat-treated (ISPM 15) timber
- Each crate marked with the shipping mark, crate number, gross and net weight and handling symbols
- Packing list keyed to the assembly drawings, so parts are identifiable on arrival
- Full document set: commercial invoice, packing list, certificate of origin and fumigation certificate
- Delivery on EXW, FOB, CIF or DDP terms depending on your forwarder arrangements
- Container loading plan supplied for large or irregular items, with a photo record of loading
Commercial terms
| Payment | Deposit on order, balance before shipment; T/T or as agreed in the contract |
|---|---|
| Currency | RMB or USD, invoiced in the agreed currency |
| Validity | Quotations held for 30 days unless stated otherwise |
| Scope basis | Material, labour, finishing, packing and freight quoted as separate lines |
| Changes | Variations priced in writing before the work proceeds |
| Warranty | Defects against workmanship and material failure within the agreed warranty period |
Quality control
- Dimensional and finish checks at each production milestone, not only at the end
- Dated progress photographs sent to the client throughout production
- Pre-shipment assembly trial for multi-part pieces, so site fit is verified before dispatch
- Third-party inspection welcome; we will prepare the access and documentation needed
- Written handover with material and colour records, so later repairs can be matched
Other techniques in this capability
Light-art installation
Light-art installations built around the light source, not the object.
Read guide →Interactive sensor installation
Interactive installations driven by sensors, gesture or sound.
Read guide →IP collaboration VM
Licensed IP installations, produced to the rights holder's standards.
Read guide →All Visual Merchandising & Installations techniques · Full capability page · Complete technique library
Need this technique on your project?
Send the brief, approximate dimensions and destination. We will come back with a technique recommendation and a reference price band.
Request a quoteHow export works