Floor index & door plates
Floor indexes, door plates and directory systems.
Overview
These are the small signs people read most often, so consistency and interchangeability matter more than individual design flourish. The system must survive years of tenant changes without looking patched.
When to choose it
Directory and floor indexing signage is chosen where a tall building must let visitors find a company or a facility quickly from a single reference point. It suits office towers, mixed-use buildings, hospitals and education campuses. It is judged by how fast someone who has never been in the building can find where they are going, which is a usability measure, not a design preference.
How it is made
The directory is structured around how people actually search - most often by company name, sometimes by function - and the panel is designed so the most searched information is the most prominent. Floor numbering, zone naming and lift grouping are made consistent with the building's own signage throughout, so the directory agrees with what the visitor finds upstairs. Update mechanisms are designed in from the start, since tenant lists change constantly, and the mounting and fixing are selected for the materials of the entrance hall.

Typical specifications
| Types | Directories, door plates, sliding tenant strips, illuminated indexes |
|---|---|
| Update method | Slide-in strips, magnetic panels or printed inserts |
| Materials | Aluminium, acrylic, stainless, glass |
| Lead time | 3-6 weeks |
Typical applications
- Lobby floor indexes
- Office door plates
- Tenant directory boards
- Meeting-room signage
- Lift lobby signage
What goes wrong on site
- Building a directory that cannot be updated without replacing the panel, in a building whose tenant list changes every year.
- Inconsistent floor or zone naming between the directory and the upper-floor signage, which is the main source of visitor confusion.
- Designing the directory before establishing how people search for a name, so the most-used information is in the least visible position.
Before an overseas project starts
How visitors search
Tell us whether people mostly look up a company name, a department or a facility. The layout follows that.
Update cycle and method
How often the tenant list changes and who updates it. The panel and the mounting are chosen to suit that.
Naming consistency
Send the building's existing floor and zone naming so the directory agrees with the signs upstairs.
Questions buyers ask
How are tenant changes handled?
The sign is designed for replacement inserts, so a new tenant means a new strip rather than a new board. This is decided at design stage.
Do you supply a template for future signs?
Yes. A documented template and artwork specification lets a local sign shop produce matching additions years later.
How a project runs
- 1. EnquirySend photographs, drawings or a 3D file with approximate dimensions and your target date. A short written brief is enough to start.
- 2. Technique recommendationWe come back with the technique that fits your substrate, viewing distance and budget, plus the alternatives we rejected and why.
- 3. Sample and quotationA colour or material sample where relevant, and a costed quotation split into material, labour, finishing, packing and freight.
- 4. ProductionWork proceeds in our own workshop with dated progress photographs at agreed milestones.
- 5. Packing and shippingCrated and marked to your forwarder's requirements, with the full export document set prepared in advance.
- 6. Installation or handoverOur own crew installs on site, or we supply a fixing method statement and supervise your contractor locally.
Packing, shipping and export
Overseas projects are normal work for us, and packing is designed for the journey rather than added afterwards. Components are numbered against a packing list so assembly on site follows the drawings.
- Export plywood crates with foam blocking, desiccant and heat-treated (ISPM 15) timber
- Each crate marked with the shipping mark, crate number, gross and net weight and handling symbols
- Packing list keyed to the assembly drawings, so parts are identifiable on arrival
- Full document set: commercial invoice, packing list, certificate of origin and fumigation certificate
- Delivery on EXW, FOB, CIF or DDP terms depending on your forwarder arrangements
- Container loading plan supplied for large or irregular items, with a photo record of loading
Commercial terms
| Payment | Deposit on order, balance before shipment; T/T or as agreed in the contract |
|---|---|
| Currency | RMB or USD, invoiced in the agreed currency |
| Validity | Quotations held for 30 days unless stated otherwise |
| Scope basis | Material, labour, finishing, packing and freight quoted as separate lines |
| Changes | Variations priced in writing before the work proceeds |
| Warranty | Defects against workmanship and material failure within the agreed warranty period |
Quality control
- Dimensional and finish checks at each production milestone, not only at the end
- Dated progress photographs sent to the client throughout production
- Pre-shipment assembly trial for multi-part pieces, so site fit is verified before dispatch
- Third-party inspection welcome; we will prepare the access and documentation needed
- Written handover with material and colour records, so later repairs can be matched
Other techniques in this capability
Gateway monument & entrance sign
Entrance monuments and gateway signage, built for weather and scale.
Read guide →All Signage & Wayfinding techniques · Full capability page · Complete technique library
Need this technique on your project?
Send the brief, approximate dimensions and destination. We will come back with a technique recommendation and a reference price band.
Request a quoteHow export works