Ceiling dome & cove
Domes, coves, oculi and coffers for high interiors.
Overview
Domes and coves are the elements that give a tall room its centre. We produce them in GRG or gypsum depending on span and weight, and co-ordinate opening, light source and decorative finish as one assembly.
When to choose it
Ceiling centres and domes are the classic way to give a room a centre of gravity, and they are chosen where the interior has the height and the formality to carry one. They suit period restorations, formal reception rooms, hotel and civic interiors with high ceilings. They are a mistake in a low room, where a ceiling centre crowds rather than crowns, and they depend entirely on the lighting being right.
How it is made
The scale is set from the ceiling height, the room's plan proportions and the position of the principal light, because a centre that looks correct in a small room is lost in a large one. Where an original exists we take a cast; where it does not, the profile is chosen from the period of the building. The fitting is positioned so the centre actually circles the light or the chandelier rose. Casting is reinforced where the span demands it, and the fixing is mechanically anchored, never adhesive alone.

Typical specifications
| Typical size | Diameter 1.5-15 m |
|---|---|
| Lead time | 6-12 weeks for a large dome |
| Structure | Independent support frame where the span requires it |
| Lighting | Cove and oculus lighting co-ordinated with MEP |
Typical applications
- Hotel lobbies and ballrooms
- Museum and gallery halls
- Theatre foyers
- Civic interiors
- Luxury retail atria
What goes wrong on site
- Choosing the centre by eye from a catalogue instead of setting the scale from the ceiling height and plan.
- Fixing an overhead casting with adhesive only - it is a weight-bearing element, not a decoration on a wall.
- Positioning the centre without reference to the light fitting, so the ornament and the fixture fight each other.
Before an overseas project starts
Ceiling height and plan
Send both, plus the position of the light or the existing rose. Scale and position both follow from them.
What it must carry
Tell us if a chandelier or heavy fixture hangs from the same point, which changes the structural requirement significantly.
Period and profile
The building's period narrows the correct profile quickly. Send photographs of any surviving original or neighbouring work.
Questions buyers ask
Who designs the structural support?
We provide setting-out and load information, and where the span requires it we work alongside your structural engineer on the support frame.
Can a dome be fitted retrospectively?
Yes, if access and ceiling load allow. We survey the existing structure and confirm the feasible diameter and fixing method before quoting.
How a project runs
- 1. EnquirySend photographs, drawings or a 3D file with approximate dimensions and your target date. A short written brief is enough to start.
- 2. Technique recommendationWe come back with the technique that fits your substrate, viewing distance and budget, plus the alternatives we rejected and why.
- 3. Sample and quotationA colour or material sample where relevant, and a costed quotation split into material, labour, finishing, packing and freight.
- 4. ProductionWork proceeds in our own workshop with dated progress photographs at agreed milestones.
- 5. Packing and shippingCrated and marked to your forwarder's requirements, with the full export document set prepared in advance.
- 6. Installation or handoverOur own crew installs on site, or we supply a fixing method statement and supervise your contractor locally.
Packing, shipping and export
Overseas projects are normal work for us, and packing is designed for the journey rather than added afterwards. Components are numbered against a packing list so assembly on site follows the drawings.
- Export plywood crates with foam blocking, desiccant and heat-treated (ISPM 15) timber
- Each crate marked with the shipping mark, crate number, gross and net weight and handling symbols
- Packing list keyed to the assembly drawings, so parts are identifiable on arrival
- Full document set: commercial invoice, packing list, certificate of origin and fumigation certificate
- Delivery on EXW, FOB, CIF or DDP terms depending on your forwarder arrangements
- Container loading plan supplied for large or irregular items, with a photo record of loading
Commercial terms
| Payment | Deposit on order, balance before shipment; T/T or as agreed in the contract |
|---|---|
| Currency | RMB or USD, invoiced in the agreed currency |
| Validity | Quotations held for 30 days unless stated otherwise |
| Scope basis | Material, labour, finishing, packing and freight quoted as separate lines |
| Changes | Variations priced in writing before the work proceeds |
| Warranty | Defects against workmanship and material failure within the agreed warranty period |
Quality control
- Dimensional and finish checks at each production milestone, not only at the end
- Dated progress photographs sent to the client throughout production
- Pre-shipment assembly trial for multi-part pieces, so site fit is verified before dispatch
- Third-party inspection welcome; we will prepare the access and documentation needed
- Written handover with material and colour records, so later repairs can be matched
Other techniques in this capability
Feature-wall gypsum relief
One wall, fully designed - graphic relief at architectural scale.
Read guide →French-style plasterwork
Ornate French and European detail - rosettes, panels and boiserie.
Read guide →All Gypsum Relief & Decorative Plaster techniques · Full capability page · Complete technique library
Need this technique on your project?
Send the brief, approximate dimensions and destination. We will come back with a technique recommendation and a reference price band.
Request a quoteHow export works