Exterior facade & hoarding painting
Large exterior surfaces - facades, hoardings and site boundary walls.
Overview
Facade and hoarding work is as much about surface preparation and access as it is about artwork. We survey the substrate, plan the access method, then build a paint system that survives UV, rain and thermal movement.
When to choose it
Outdoor mural work is a materials problem before it is an art problem. The wall will get rain, UV, freeze-thaw, pollution and thermal movement, and the finish has to survive all of it while looking deliberate rather than weathered. It suits hoarding, facade panels, exterior feature walls and long-lived public work. It is not the place to specify an interior system and hope, which is the most common reason exterior murals fail in the second year.
How it is made
The substrate is inspected for damp, salt, efflorescence and loose render before anything is applied, because no coating survives a failing background. Materials are selected as a system - primer, base, colour and protective coat from one compatible family - rather than assembled from whatever is on site. Movement joints and substrate changes are respected, with the coating detailed to accommodate them instead of bridging and cracking. A UV-stable clear coat is specified at the sheen appropriate to the orientation and the glare.

Typical specifications
| Typical size | 100-5,000 m2 |
|---|---|
| Access | Scaffold, boom lift or rope access, surveyed on site |
| Lead time | 1-4 weeks, weather dependent |
| Paint system | Primer, anti-UV colour coats, water-repellent sealer |
Typical applications
- Construction hoardings
- Building facades
- Site boundary walls
- Industrial exteriors
- Sports and event venues
What goes wrong on site
- Coating over a damp or salt-contaminated wall, which pushes the failure out rather than fixing it and blisters within a season.
- Bridging a movement joint with a rigid finish, guaranteeing a crack exactly where you least want one.
- Mixing products from different manufacturers, so the layers are individually sound but incompatible with each other.
Before an overseas project starts
Orientation and climate
Which way the wall faces, what the annual weather does, and whether it is coastal or industrial. Each drives a different specification.
Substrate report
Photographs plus whatever is known about the build-up, damp history and previous coatings. Where there is doubt we test before pricing.
Design life expectation
Tell us whether this is a two-year hoarding or a fifteen-year facade. It changes the specification completely and honestly.
Questions buyers ask
Can you work at height?
Yes. Access method is surveyed and priced separately, and operatives used for rope or boom-lift work hold the relevant certification.
What if it rains mid-project?
Exterior schedules build in weather days. Primed surfaces can be left safely between coats, and we agree a daily cut-off point with you.
How a project runs
- 1. EnquirySend photographs, drawings or a 3D file with approximate dimensions and your target date. A short written brief is enough to start.
- 2. Technique recommendationWe come back with the technique that fits your substrate, viewing distance and budget, plus the alternatives we rejected and why.
- 3. Sample and quotationA colour or material sample where relevant, and a costed quotation split into material, labour, finishing, packing and freight.
- 4. ProductionWork proceeds in our own workshop with dated progress photographs at agreed milestones.
- 5. Packing and shippingCrated and marked to your forwarder's requirements, with the full export document set prepared in advance.
- 6. Installation or handoverOur own crew installs on site, or we supply a fixing method statement and supervise your contractor locally.
Packing, shipping and export
Overseas projects are normal work for us, and packing is designed for the journey rather than added afterwards. Components are numbered against a packing list so assembly on site follows the drawings.
- Export plywood crates with foam blocking, desiccant and heat-treated (ISPM 15) timber
- Each crate marked with the shipping mark, crate number, gross and net weight and handling symbols
- Packing list keyed to the assembly drawings, so parts are identifiable on arrival
- Full document set: commercial invoice, packing list, certificate of origin and fumigation certificate
- Delivery on EXW, FOB, CIF or DDP terms depending on your forwarder arrangements
- Container loading plan supplied for large or irregular items, with a photo record of loading
Commercial terms
| Payment | Deposit on order, balance before shipment; T/T or as agreed in the contract |
|---|---|
| Currency | RMB or USD, invoiced in the agreed currency |
| Validity | Quotations held for 30 days unless stated otherwise |
| Scope basis | Material, labour, finishing, packing and freight quoted as separate lines |
| Changes | Variations priced in writing before the work proceeds |
| Warranty | Defects against workmanship and material failure within the agreed warranty period |
Quality control
- Dimensional and finish checks at each production milestone, not only at the end
- Dated progress photographs sent to the client throughout production
- Pre-shipment assembly trial for multi-part pieces, so site fit is verified before dispatch
- Third-party inspection welcome; we will prepare the access and documentation needed
- Written handover with material and colour records, so later repairs can be matched
Other techniques in this capability
Hotel & guesthouse wall art
Guest-room and lobby artwork delivered to a repeatable standard.
Read guide →3D trompe-l'œil wall
Painted depth - architecture, openings and perspective that are not really there.
Read guide →All Wall Painting & Murals techniques · Full capability page · Complete technique library
Need this technique on your project?
Send the brief, approximate dimensions and destination. We will come back with a technique recommendation and a reference price band.
Request a quoteHow export works