Shopfront & brand wall
Frontage walls that carry the brand where people walk past.
Overview
A shopfront wall is seen in passing, at an angle and often in poor light. We design for those conditions: bold shapes, high contrast and materials chosen for rain, sun and street grime rather than showroom conditions.
When to choose it
A shopfront or entrance wall has one job: make the right person stop. It is read in motion, from a distance and usually in poor light, so the design has to be legible in three seconds rather than satisfying at arm's length. It suits premises with passing traffic and a clear offer. It is the wrong place for subtle work, and the wrong place for anything that cannot be cleaned, because street-facing surfaces collect everything the road throws at them.
How it is made
We design to the approach: which direction people move, how fast, and at what distance the sign first becomes readable. Type is sized from that distance, not from taste, and the contrast ratio is set against the actual facade colour. Materials are chosen for weathering and for the local climate - UV-stable pigments, sealed or anti-graffiti finishes on street-facing walls, and fixings that will not stain the render as they age. Illumination, if used, is planned with the artwork rather than bolted on afterwards.

Typical specifications
| Typical size | 5-120 m2 |
|---|---|
| Materials | Exterior mural, cement board print, metal and acrylic letters |
| Lead time | 2-4 weeks |
| Weathering | Anti-UV and water-repellent systems |
Typical applications
- Street shopfronts
- Mall storefronts
- F&B frontages
- Showroom facades
- Service entrances
What goes wrong on site
- Sizing type on a screen, which produces signage that is unreadable from the pavement where it actually lives.
- Ignoring the direction of approach, so the entrance reads well from the wrong side of the street.
- Using an unsealed finish on a street-facing wall, which collects grime in the texture and greys out within a year.
Before an overseas project starts
Approach and speed
Send a photograph from the direction most customers approach, at the distance where you want the sign to register. That single shot sets the type size.
Facade condition
Note render, cladding or stone, its state, and any damp or cracking. Fixings and preparation follow from it.
Local rules
Many councils and landlords control signage size, illumination and colour. Confirm what is permitted before design, not after.
Questions buyers ask
Does the frontage work need landlord approval?
Almost always. We can supply drawings and material specifications in the format mall and landlord design-review teams expect.
How is it cleaned?
Sealed exterior surfaces wash down with water and a mild detergent. We hand over the specification so a cleaning contractor does not damage the finish.
How a project runs
- 1. EnquirySend photographs, drawings or a 3D file with approximate dimensions and your target date. A short written brief is enough to start.
- 2. Technique recommendationWe come back with the technique that fits your substrate, viewing distance and budget, plus the alternatives we rejected and why.
- 3. Sample and quotationA colour or material sample where relevant, and a costed quotation split into material, labour, finishing, packing and freight.
- 4. ProductionWork proceeds in our own workshop with dated progress photographs at agreed milestones.
- 5. Packing and shippingCrated and marked to your forwarder's requirements, with the full export document set prepared in advance.
- 6. Installation or handoverOur own crew installs on site, or we supply a fixing method statement and supervise your contractor locally.
Packing, shipping and export
Overseas projects are normal work for us, and packing is designed for the journey rather than added afterwards. Components are numbered against a packing list so assembly on site follows the drawings.
- Export plywood crates with foam blocking, desiccant and heat-treated (ISPM 15) timber
- Each crate marked with the shipping mark, crate number, gross and net weight and handling symbols
- Packing list keyed to the assembly drawings, so parts are identifiable on arrival
- Full document set: commercial invoice, packing list, certificate of origin and fumigation certificate
- Delivery on EXW, FOB, CIF or DDP terms depending on your forwarder arrangements
- Container loading plan supplied for large or irregular items, with a photo record of loading
Commercial terms
| Payment | Deposit on order, balance before shipment; T/T or as agreed in the contract |
|---|---|
| Currency | RMB or USD, invoiced in the agreed currency |
| Validity | Quotations held for 30 days unless stated otherwise |
| Scope basis | Material, labour, finishing, packing and freight quoted as separate lines |
| Changes | Variations priced in writing before the work proceeds |
| Warranty | Defects against workmanship and material failure within the agreed warranty period |
Quality control
- Dimensional and finish checks at each production milestone, not only at the end
- Dated progress photographs sent to the client throughout production
- Pre-shipment assembly trial for multi-part pieces, so site fit is verified before dispatch
- Third-party inspection welcome; we will prepare the access and documentation needed
- Written handover with material and colour records, so later repairs can be matched
Other techniques in this capability
Hotel & guesthouse wall art
Guest-room and lobby artwork delivered to a repeatable standard.
Read guide →3D trompe-l'œil wall
Painted depth - architecture, openings and perspective that are not really there.
Read guide →All Wall Painting & Murals techniques · Full capability page · Complete technique library
Need this technique on your project?
Send the brief, approximate dimensions and destination. We will come back with a technique recommendation and a reference price band.
Request a quoteHow export works