Building facade lighting
Facade lighting that reveals the building's form after dark.
Overview
Facade lighting is architecture after dark: it should show the building's structure rather than flatten it. We design the effect around the elevations, then engineer the fittings, routing and control that deliver it.
When to choose it
Stair and circulation lighting is chosen where a vertical or continuous route needs to be legible, safe and pleasant, usually with no daylight and often in a building that is occupied around the clock. It suits residential cores, office atria, hotels and public buildings. The design responsibility sits between decoration and life safety, so statutory escape lighting and architectural lighting must both be resolved and clearly separated.
How it is made
The route is studied as a sequence, since the experience is of moving through, not of standing still. Lighting is designed to guide - revealing the treads, marking the landings, giving a sense of the floor level - with glare controlled so it does not dazzle someone descending. Fixtures are selected for the maintenance reality: long-life sources and access that does not require scaffolding in a stair core. Emergency lighting is designed as a separate, certified system, and the architectural scheme is coordinated around it rather than compromising it.

Typical specifications
| Design | Night-time renders and lux levels agreed before specification |
|---|---|
| Fittings | IP65+ exterior LED, linear, flood and projection |
| Control | Astronomical time clock, DALI or DMX scene control |
| Lead time | 8-16 weeks including design and commissioning |
Typical applications
- Office and commercial facades
- Hotels and mixed-use buildings
- Civic and public buildings
- Bridges and infrastructure
- Retail frontages
What goes wrong on site
- Treating the architectural lighting and the emergency lighting as one system, which satisfies neither the design nor the regulations.
- Specifying fittings that need frequent lamp changes in a stair core, where access is difficult and expensive.
- Designing for a view from one landing, when the experience is continuous and the glare problem is at eye level going down.
Before an overseas project starts
Route and occupancy
Tell us how the space is used and at what hours. Circulation lighting is designed as a sequence, not as a set of isolated positions.
Emergency lighting
Confirm who is providing the certified escape lighting and to what standard. Architectural lighting is coordinated around it.
Maintenance access
Tell us how fittings will be reached and changed. In stair cores this shapes the fixture choice more than aesthetics.
Questions buyers ask
Will the lighting disturb neighbours or the sky?
It is designed not to, with shielding, cut-off optics and reduced after-hours scenes. Light spill is modelled before specification.
What maintenance is required?
Scheduled cleaning and lamp or module replacement, with access designed in. Rope access or lift access is agreed at design stage.
How a project runs
- 1. EnquirySend photographs, drawings or a 3D file with approximate dimensions and your target date. A short written brief is enough to start.
- 2. Technique recommendationWe come back with the technique that fits your substrate, viewing distance and budget, plus the alternatives we rejected and why.
- 3. Sample and quotationA colour or material sample where relevant, and a costed quotation split into material, labour, finishing, packing and freight.
- 4. ProductionWork proceeds in our own workshop with dated progress photographs at agreed milestones.
- 5. Packing and shippingCrated and marked to your forwarder's requirements, with the full export document set prepared in advance.
- 6. Installation or handoverOur own crew installs on site, or we supply a fixing method statement and supervise your contractor locally.
Packing, shipping and export
Overseas projects are normal work for us, and packing is designed for the journey rather than added afterwards. Components are numbered against a packing list so assembly on site follows the drawings.
- Export plywood crates with foam blocking, desiccant and heat-treated (ISPM 15) timber
- Each crate marked with the shipping mark, crate number, gross and net weight and handling symbols
- Packing list keyed to the assembly drawings, so parts are identifiable on arrival
- Full document set: commercial invoice, packing list, certificate of origin and fumigation certificate
- Delivery on EXW, FOB, CIF or DDP terms depending on your forwarder arrangements
- Container loading plan supplied for large or irregular items, with a photo record of loading
Commercial terms
| Payment | Deposit on order, balance before shipment; T/T or as agreed in the contract |
|---|---|
| Currency | RMB or USD, invoiced in the agreed currency |
| Validity | Quotations held for 30 days unless stated otherwise |
| Scope basis | Material, labour, finishing, packing and freight quoted as separate lines |
| Changes | Variations priced in writing before the work proceeds |
| Warranty | Defects against workmanship and material failure within the agreed warranty period |
Quality control
- Dimensional and finish checks at each production milestone, not only at the end
- Dated progress photographs sent to the client throughout production
- Pre-shipment assembly trial for multi-part pieces, so site fit is verified before dispatch
- Third-party inspection welcome; we will prepare the access and documentation needed
- Written handover with material and colour records, so later repairs can be matched
Other techniques in this capability
Light festival & light show
Light festivals and light shows, programmed as a timed experience.
Read guide →Luminous art installation
Luminous art - light used as the material of the artwork itself.
Read guide →Architectural projection mapping
Architectural projection mapping, aligned to the building itself.
Read guide →All Architectural Lighting & Light Art techniques · Full capability page · Complete technique library
Need this technique on your project?
Send the brief, approximate dimensions and destination. We will come back with a technique recommendation and a reference price band.
Request a quoteHow export works