Festoon & strip lighting
Festoon and linear strip lighting for atmosphere and outlining.
Overview
Festoon and strip lighting is the least fussy way to add warmth to a space or to draw a line along a structure. It is used for outdoor dining, market streets and architectural outlining.
When to choose it
Lantern and light-boat work is chosen where a place, festival or waterway wants a distinctive night-time identity drawn from a local tradition rather than from a generic festive vocabulary. It suits cultural districts, water towns, temples, parks and heritage settings. It succeeds when it is genuinely rooted in the local form and fails when a generic lantern is used in a place with its own tradition.
How it is made
The design starts from the local tradition - the form, the construction method, the colours and the occasion - so the result reads as belonging to the place. Lantern structures are built from materials chosen for outdoor exposure and for fire safety, with the light source designed for the maintenance regime and for access without dismantling. Where installations sit on or near water, materials, ballasting and electrical safety are specified for the conditions. The elements are usually modular so a large scene can be built from a manageable set of components and struck at the end of the season.

Typical specifications
| Types | Festoon string, neon flex, linear LED, pixel strip |
|---|---|
| Ratings | IP65+ exterior with sealed connectors |
| Control | Static, dimmable, or pixel-mapped |
| Lead time | 3-8 weeks |
Typical applications
- Outdoor dining and terraces
- Market and festival streets
- Trees and pergolas
- Facade and roof outlining
- Event venues
What goes wrong on site
- Using a generic lantern form in a place with its own tradition, which locals notice immediately and visitors never see.
- Ignoring water and weather conditions on a waterway installation, where ballast, sealing and electrical safety are critical.
- Building lanterns that cannot be struck and stored, when most of this work returns the following year.
Before an overseas project starts
Local tradition
Tell us the local form, technique and occasion. The design should derive from them rather than from a catalogue.
Siting and water
If the installation is on water, tell us the conditions. Ballast, materials and electrical protection all follow from it.
Season and storage
Tell us the run and whether the elements are stored. Modular construction is what makes the following year affordable.
Questions buyers ask
Can a long run be switched in sections?
Yes, and long runs should be. Sections allow part-load operation, easier fault-finding and safer replacement.
Will the connectors last outdoors?
With sealed, IP-rated connectors and proper strain relief, yes. Poorly protected connections are the usual cause of premature exterior failures.
How a project runs
- 1. EnquirySend photographs, drawings or a 3D file with approximate dimensions and your target date. A short written brief is enough to start.
- 2. Technique recommendationWe come back with the technique that fits your substrate, viewing distance and budget, plus the alternatives we rejected and why.
- 3. Sample and quotationA colour or material sample where relevant, and a costed quotation split into material, labour, finishing, packing and freight.
- 4. ProductionWork proceeds in our own workshop with dated progress photographs at agreed milestones.
- 5. Packing and shippingCrated and marked to your forwarder's requirements, with the full export document set prepared in advance.
- 6. Installation or handoverOur own crew installs on site, or we supply a fixing method statement and supervise your contractor locally.
Packing, shipping and export
Overseas projects are normal work for us, and packing is designed for the journey rather than added afterwards. Components are numbered against a packing list so assembly on site follows the drawings.
- Export plywood crates with foam blocking, desiccant and heat-treated (ISPM 15) timber
- Each crate marked with the shipping mark, crate number, gross and net weight and handling symbols
- Packing list keyed to the assembly drawings, so parts are identifiable on arrival
- Full document set: commercial invoice, packing list, certificate of origin and fumigation certificate
- Delivery on EXW, FOB, CIF or DDP terms depending on your forwarder arrangements
- Container loading plan supplied for large or irregular items, with a photo record of loading
Commercial terms
| Payment | Deposit on order, balance before shipment; T/T or as agreed in the contract |
|---|---|
| Currency | RMB or USD, invoiced in the agreed currency |
| Validity | Quotations held for 30 days unless stated otherwise |
| Scope basis | Material, labour, finishing, packing and freight quoted as separate lines |
| Changes | Variations priced in writing before the work proceeds |
| Warranty | Defects against workmanship and material failure within the agreed warranty period |
Quality control
- Dimensional and finish checks at each production milestone, not only at the end
- Dated progress photographs sent to the client throughout production
- Pre-shipment assembly trial for multi-part pieces, so site fit is verified before dispatch
- Third-party inspection welcome; we will prepare the access and documentation needed
- Written handover with material and colour records, so later repairs can be matched
Other techniques in this capability
Light festival & light show
Light festivals and light shows, programmed as a timed experience.
Read guide →Luminous art installation
Luminous art - light used as the material of the artwork itself.
Read guide →Architectural projection mapping
Architectural projection mapping, aligned to the building itself.
Read guide →Festival light decoration
Festival light decoration for streets, malls and public spaces.
Read guide →All Architectural Lighting & Light Art techniques · Full capability page · Complete technique library
Need this technique on your project?
Send the brief, approximate dimensions and destination. We will come back with a technique recommendation and a reference price band.
Request a quoteHow export works