Briefing - 2026-10-19 - 9 min read

How to write a brief for bespoke work: the clearer the input, the tighter the quote

The same space briefed vaguely and briefed precisely can produce quotes an order of magnitude apart, and very different rework rates. Eight sections: site conditions, use and viewing conditions, how to give style references correctly, hard constraints, scope boundaries, review process, decision maker, and a table of contents you can copy.

Summary. The same space briefed vaguely and briefed precisely can produce quotes an order of magnitude apart, and very different rework rates. Eight sections: site conditions, use and viewing conditions, how to give style references correctly, hard constraints, scope boundaries, review process, decision maker, and a table of contents you can copy.

The most common opening line from a client is 'send us a concept first'. Behind it is an undefined brief: the designer produces one interpretation, the client feels it is wrong but cannot say why, and after three rounds everyone is tired. The problem is not design capability; the requirements were never translated into executable constraints. The eight sections below explain what each contains and what goes wrong if it is left out.

1. Why a vague brief guarantees an inaccurate quote

Bespoke pricing is not area multiplied by a unit rate. It is a chain of concrete conditions: size, material, structural complexity, working window, access constraints, whether derig and reinstatement are needed. Leave one undefined and the estimator must assume - and every estimator assumes differently. Two outcomes follow: a low quote followed by variations, or a cautious high quote that the client finds expensive but cannot unpack. A clear brief creates a shared basis for pricing and turns 'is it expensive?' into a line-by-line discussion.

2. Site conditions: without these, design is guesswork

This should come first and is most often skipped. Include at least: three-dimensional space dimensions including clear height under beams; the wall or floor area available for work; substrate material and condition (concrete, plasterboard, tile, glazing); available power locations and capacity; whether any structural member can carry a hung load; and goods lift, corridor and door dimensions with load limits. If the client does not know, a short site video plus a few photographs with a scale reference and a floor plan is the cheapest fix. Better still, arrange one site survey - an hour of measuring beats ten photographs.

3. Use and viewing conditions: who looks, for how long, and when

The same form in a three-metre shop window and in a twenty-metre atrium follows completely different design logic. State the principal viewing distance, whether the audience passes by or dwells, whether photographs are part of the intent, and whether the piece is seen mainly by day or at night. State the intended service life too: a two-week seasonal installation and a three-year permanent one need very different materials and structures - the former can be lightweight, the latter must account for ageing and maintenance. Without this line, work gets built to a temporary standard and judged against a permanent one.

4. Give references, but say what each one is a reference for

Sending a folder of reference images is the most common and least effective approach. One image simultaneously carries form, palette, material, lighting and atmosphere, and the designer cannot tell which of the five you want, so unwanted ones get copied too. A better sentence annotates each image: 'this one is for proportion', 'this one is for palette', 'this one is only for the lighting mood - ignore the form'. Ask for two or three mood boards to confirm direction before a rendering is produced; a mood board changes in minutes, a rendering takes days.

5. Hard constraints: brand rules, fire, structure, calendar

These are the lines that cannot be crossed, and they belong in a separate section rather than appearing after the design is finished. Four usual ones: brand visual standards (specified colour values, logo rules, prohibited elements); fire requirements (egress width, clearance to services, reaction-to-fire classification of materials); structural limits (where loads may be applied, allowable loads); and the calendar (immovable completion date, whether night work is allowed). Put the calendar early - a project with three days left and one with a month of slack allow completely different processes, and some processes need curing time that cannot be compressed.

6. Scope boundaries: what is included and what is not

'Finished' is ambiguous in bespoke work. Does it include freight? Site installation? Substrate preparation? Derig and reinstatement? Waste removal? Each is real work that tends to be assumed as included at quotation stage. The most useful device is a two-column included / excluded table, ticked line by line by both parties. That table becomes the structure of the quotation and later the basis of acceptance. Doing this one step removes a large share of final-account disputes.

7. Review process and decision maker: who signs off, and how many rounds

Projects slow down less from workload than from an unclear decision chain: three people comment and nobody decides; each review brings a new person and a new direction; by round five the original brief is unrecognisable. State two things in the brief: one named final decision maker, not 'the leadership team', and the review nodes with the number of revision rounds at each and the price of additional rounds. This actually benefits the client, because it converts unlimited revision into something with a visible cost.

8. A table of contents you can copy

Put the seven sections together: (1) background and objective in one sentence; (2) site conditions - dimensions, substrate, power, access, structure; (3) use and viewing conditions - distance, time of day, service life; (4) style direction - reference images with per-image annotations; (5) hard constraints - brand, fire, structure, calendar; (6) scope - included / excluded list; (7) review and decision mechanism - decision maker, nodes, rounds; (8) budget range and pricing basis.

The eighth deserves its own note. Giving a budget range is far better than giving none: a range lets the designer propose within what is achievable, whereas no budget usually produces a scheme well beyond it, followed by a round of subtraction that makes the result progressively worse.

Go deeper

From the workshop

Technique library

101 in-depth technique guides grouped by capability.

Open library →

How we work

The seven-step process from brief to crated delivery, plus how quotations are built.

Read process →

Export & terms

Packing, documentation, freight terms and what an overseas buyer needs to confirm.

Read terms →
Also in the library

Three ways into the material

Technique articles explain how the work is made. Buyer insights explain how a project is specified, approved and accepted. The Q&A section answers the questions that come up before a quotation is agreed.

Technical knowledge base

22 in-depth articles on materials, processes, installation QA and applications.

Open section →

Buyer insights

7 long-form guides on contracts, site access, acceptance, briefing and aftercare.

Open section →

Buyer Q&A

96 practical answers grouped into 8 themes.

Open section →

Tell us what you are building

Send photos, dimensions, the destination country and your target date. You will get a technique recommendation, a reference price band and a production schedule - no obligation.

Request a quoteHow export works