Summary. The stage that delays display projects is rarely fabrication; it is getting onto the floor. Eight steps: who approves, the document pack, permits and deposits, night working hours, goods lift limits, temporary power and hot work, concurrent trades, and deposit recovery on derig. Includes a document checklist.
The most underestimated phase of a display project is access. Fabrication in a workshop is controllable; access involves property management, mall operations, fire safety and neighbouring tenants, and one stalled approval pushes the programme back - which usually means missing a seasonal trading window, the most expensive loss of all. The eight steps below are the checklist we work through before mobilisation, and they are useful whoever carries out the installation.
1. Establish who approves: property, operations and fire may be three departments
Approvals stall less often because documents are missing than because they were sent to the wrong team. In a mixed-use complex, approval can sit in three places: property engineering for site services and power, mall operations for image and calendar, and fire control for fire safety. Suspended atrium work may additionally need a structural opinion from the original design institute or a third party. Before preparing a single document, obtain the written access requirements - many malls publish a contractor handbook - and identify the receiving department and contact, the required submissions, and the turnaround time for each step. Only then can a realistic programme be built.
2. Submit the document pack once, not in stages
Piecemeal submission is a programme killer, because each additional document restarts the approval clock. A normal pack includes business registration and relevant qualifications, a method statement covering process, programme and staffing, a site plan and renderings, structural notes or calculations where relevant, trade licences for special operations, identification and safety-training records for the crew, and insurance certificates. Temporary power needs its own scheme; hot work such as welding or cutting needs a hot-work permit; work at height needs a method statement and operator qualifications. These addenda are often bundled into the general submission and then rejected, restarting the whole process.
3. Work permits and deposits: ask about the release conditions
Permits are usually issued per person, charged either by duration or per person per day, and accompanied by a deposit. The deposit is not the real cost; the release conditions are. Ask three questions: amount and who pays it, who judges whether the reinstatement standard has been met, and what triggers a deduction - typically cleaning, waste removal, damage to common facilities and overrunning the booked area. Photograph the site before access with timestamps: floors, walls, lift cars, corridors, common facilities. Repeat from the same angles at derig; that pair of photo sets is the most direct evidence in a deposit dispute.
4. The night window: how late, and how noise and dust are controlled
Trading spaces rarely allow daytime work because of noise, dust, odour and blocked circulation. A common window runs from closing to before opening, roughly 22:00 to 06:00, subject to the site's rules. What reduces output is not only the length but the entry and exit: crews wait for the mall to clear and must restore the area before cleaning crews arrive, so effective working time is often one to two hours shorter than the nominal window. Agree dust and noise controls in advance: do cutting in the workshop and assemble on site, use extraction and screening where cutting is unavoidable, and schedule solvent-bearing coatings a day early so no odour remains at opening.
5. Goods lift, corridors and load limits: can the large pieces actually get in?
This belongs at drawing stage and is too often discovered on delivery day. Lift car dimensions and rated load, corridor clear width and turning space, whether the loading dock can take the vehicle, and the floor's load capacity all work backwards into how the piece must be split. Obtain these constraints during design and divide the installation accordingly, placing joints where they are least visible and allowing time for on-site assembly and joint finishing. A beautiful monolithic detail that cannot enter the building is not a detail.
6. Temporary power, hot work and protecting fire systems
Temporary power needs a submitted scheme and connection at a designated point; power rating, earthing and cable routing all get inspected, so an ad-hoc extension lead is not acceptable. Hot work requires a separate permit, extinguishers on site, a fire watcher and an observation period after the work ends. These two are the items most often spot-checked. Equally easy to miss: sprinkler heads, smoke detectors, emergency speakers and exit signs must not be obscured or contaminated during the works, and barriers must not reduce the required egress width. A breach here means a stop-work order at best and a withheld deposit at worst.
7. Concurrent trades and neighbouring tenants: written handover beats a conversation
Few commercial sites have only one contractor working. Other tenants may be fitting out, the mall may be carrying out maintenance, and lighting or audio may be commissioned in parallel. Two problems recur: competing for the same area at the same time, and finished surfaces damaged with nobody accepting responsibility. The response is simple but must be enforced: hold a written handover with other contractors before access, recording each party's zone and time slot; protect and photograph your own completed work immediately, and have the next trade confirm its condition when it takes over. With photographs, a scratch has an owner.
8. Derig and deposit recovery: ask for the standard at access, not at inspection
Ask what derig acceptance requires on the day you arrive, because standards vary widely. Some sites only require waste removed and the area clean; others require holes filled, walls restored and floors free of scratches; seasonal displays may also carry a deadline with daily charges for overrun. Once you have the standard, work two things backwards: whether reinstatement is priced separately (many quotations exclude it) and how many days to allow for reinstatement and inspection. Without those, the common outcome is work completed but deposit not returned.
From the workshop
How we work
The seven-step process from brief to crated delivery, plus how quotations are built.
Read process →Export & terms
Packing, documentation, freight terms and what an overseas buyer needs to confirm.
Read terms →Three ways into the material
Technique articles explain how the work is made. Buyer insights explain how a project is specified, approved and accepted. The Q&A section answers the questions that come up before a quotation is agreed.
Technical knowledge base
22 in-depth articles on materials, processes, installation QA and applications.
Open section →Buyer insights
7 long-form guides on contracts, site access, acceptance, briefing and aftercare.