Summary. Handover is not the end. Cracking, detachment, fading, luminaire failure and loose fixings all raise the same questions: is it covered, who repairs it, how fast. Seven sections on drawing the boundary, diagnosing causes before repairing, response tiers, who attends, spares, seasonal reuse and the value of a repair log.
Most aftercare disputes are not about nobody coming to fix something; they are about whether the fault was ever defined as covered. The client sees a failure a few months after completion and assumes a quality defect; the fabricator sees a usage environment or accidental damage. This article turns aftercare into discussable parts: how to draw the warranty boundary, how to diagnose common faults, how to write response times, and how to handle seasonal installations.
1. A warranty is not 'everything covered': separate three categories
Aftercare issues fall into three groups: workmanship defects, material ageing, and external damage. The first is covered; the second depends on reasonable service life and environment; the third is normally outside the warranty but can be repaired on a chargeable basis. Without that shared understanding, a dispute has no resolution. The contract should give two or three concrete examples of each rather than only saying 'free repair during the warranty period': workmanship defects such as hollow relief detaching, coating peeling or split seams; ageing such as UV-driven fading on exterior work; external damage such as impact, water immersion or unauthorised modification. The more concrete the list, the easier the later judgement.
2. Diagnose the cause before repairing
Cracking is the most common complaint, but it has several causes: a hollow substrate cracking the finish, shrinkage within the material, or structural movement pulling it apart. The treatments are completely different - patching the surface leaves the substrate problem intact and the crack returns months later. The proper sequence is to establish the cause first. Detachment usually traces to substrate preparation (not cleaned, no primer, moisture too high); fading to UV exposure and material grade; luminaire failure more often to drivers and connectors than to the light source itself. Skip diagnosis and aftercare becomes repeated patching of a recurring fault.
3. Response times matter more than the number of warranty years
'Two-year warranty' is worth only what happens after a call. Agree at least three tiers: an hours-level response acknowledging the issue and giving an initial assessment, a days-level attendance scaled to urgency, and a completion deadline. Urgency differs by scenario: anything involving safety - a loosening hanger, a component at risk of falling - takes the highest tier and normally same-day attendance; appearance-only issues such as local fading or a small crack follow the normal rhythm. Writing the two apart is more executable than one blanket rule.
4. Who actually attends: the original crew or a local team
Cross-city projects need a different execution model from local ones. Three common options: send the original installation crew (best quality, highest cost), use a vetted local partner (fast response, less familiarity with the original method), or remote guidance with the client handling small fixes (cheapest, least predictable result). None is universally best; the point is to agree it in advance. State in the contract who performs warranty repairs, who carries travel cost, and which scale of problem uses which route. Remote projects especially need this, or a small repair stalls for weeks over travel expenses.
5. Keep spares: the cost is small, the value is high
Luminaires, a specific paint colour and custom components share one problem: replacing them later often means they no longer match. A different batch of the same product shows a slight colour shift, and the mould for a custom part may no longer exist. Agree at handover to retain a small quantity - a litre or two of the same colour coating, one or two spare luminaires and drivers, one spare custom component - handed to the client with storage conditions noted (coating must be protected from frost and heat). The difference in repair quality with and without spares is substantial.
6. Seasonal installations: derig, storage and reuse
Seasonal displays are usually expected to be reused - installed this year, brought back next. Whether that is possible is decided at design stage: can the structure be split into modules, are connectors reusable, will the materials tolerate storage? Without demountable design, the second year usually means rebuilding. Clients planning reuse should state the intended number of seasons at brief stage so the designer can build in demountable joints, and should obtain disassembly instructions and a packaging scheme at handover. Specify storage conditions too: dry, laid flat, nothing stacked heavily on top.
7. The repair log is itself an asset
Every repair should be recorded: date, symptom, diagnosed cause, treatment, materials used, person responsible. That record does two jobs: a recurring fault is located quickly, and repeated occurrences reveal whether a problem is incidental or systemic. For the client it becomes especially valuable when changing suppliers, because a new team can understand the installation's history and weak points in minutes. Set up the log at handover - paper or digital - and append one page per repair. It costs almost nothing and saves a great deal of repeated investigation.
From the workshop
How we work
The seven-step process from brief to crated delivery, plus how quotations are built.
Read process →Export & terms
Packing, documentation, freight terms and what an overseas buyer needs to confirm.
Read terms →Three ways into the material
Technique articles explain how the work is made. Buyer insights explain how a project is specified, approved and accepted. The Q&A section answers the questions that come up before a quotation is agreed.
Technical knowledge base
22 in-depth articles on materials, processes, installation QA and applications.
Open section →Buyer insights
7 long-form guides on contracts, site access, acceptance, briefing and aftercare.
Open section →Tell us what you are building
Send photos, dimensions, the destination country and your target date. You will get a technique recommendation, a reference price band and a production schedule - no obligation.
Request a quoteHow export works