About the figures on this page. Prices on this page are reference ranges for projects delivered inside China, shown in CNY. Export projects are quoted individually in USD after the brief, site conditions, freight and installation scope are confirmed. All ranges are indicative, not a fixed rate, and no outcome or exposure is promised.
Programme and lead times
Realistic durations for murals, relief, sculpture, displays and printed work, plus what rush work, remote sites and night access actually change. Twelve scheduling questions.
How long from order to completion?
For a typical small-to-medium project, allow about two to four weeks from approved design to completion. Consultation can happen the same day, survey and concept take one to three days, then material procurement, fabrication and site work follow, with acceptance on the final day. Murals are driven by area and crew size; relief, sculpture and displays add factory time, freight and installation. The usual delays are repeated design changes, approvals, substrate remediation and material delivery.
How many days does a mural take?
A conventional 20-40 square metre mural takes roughly two to five days with one or two painters; realistic figurative work needing many glazing passes takes longer. Output is commonly around 10-20 square metres per painter per day for standard imagery, or 5-10 for detailed realism. Adding painters compresses the calendar but requires an agreed colour standard in advance to control seams and colour drift.
How long does relief work take?
Gypsum relief is often moulded in the workshop and assembled on site: 10-20 square metres takes roughly 7-15 days overall, with 7-20 days a reasonable planning band. Site-modelled cement or GRC involves reinforcement, layered application and curing, so 15-30 days is common. Complexity, area, cast-in structural work, curing time and whether the site allows continuous work all affect the figure.
How far ahead should a seasonal mall display be commissioned?
Start four to eight weeks before opening: week one for briefing and design, weeks two and three for approvals and shop drawings, weeks three to six for fabrication, and the final stage for night installation. Public holidays are the annual peak for both design and factory capacity, so late commissions become expensive and rushed. One month is adequate for a standard project but tight; six to eight weeks is safer in peak season.
We only realised just before opening - is it still possible?
Usually yes, if the scope is reduced. With ten to fifteen days, murals, printed graphics and small display sets are feasible; with under five days, concentrate on one focal wall or a fast-install prefabricated element. Rush tactics are narrowing the scope, choosing fast processes, running design and procurement in parallel, and working at night. The cost is a rush premium and a smaller set of viable methods.
How long does a 3D-printed piece take?
Small pieces take one to three days including sanding and painting; large segmented pieces with joining, filling and colour work take roughly three to seven days. Material matters: resin needs washing and post-curing, PLA is quick, and nylon or specialty materials may queue. Same-day collection is realistic only for a very small simple part.
How long does a custom sculpture take?
Count modelling, setting out, fabrication, surface treatment, freight and installation. FRP takes roughly two to four weeks; stainless steel with welding, grinding and polishing three to six; cast bronze six to twelve; stone is heaviest and needs extra transport and lifting time. Outdoor large-scale work adds foundation construction and craneage, which frequently take longer than expected. A reduced-scale maquette first is a good way to avoid rework.
Can work be rushed, and what does it cost?
Most projects can be accelerated, typically with a 10-30 percent premium, because rush means adding people or night shifts to available capacity. Printed work and prefabricated installation are easiest to accelerate; cement curing and bronze casting are physical time and cannot be compressed. Freight and site access permits must also fit the shorter programme, especially on cross-city work. A proper rush adds resources rather than removing steps - be cautious if a supplier achieves speed by skipping processes.
How much longer do projects outside Shanghai take?
Allow roughly two to seven extra days on top of the local programme for freight, travel and site organisation. The biggest variables are transport - oversize pieces need a dedicated vehicle, lifting equipment and access permits - and site conditions in remote locations. Key processes are completed in the workshop and the site work is standardised assembly, which is what keeps quality consistent. Travel and freight are listed separately in the quotation.
Does the business have to close, and can work happen at night?
Most projects can run alongside trading or at night. Low-disruption processes such as printing and applied graphics can happen during opening hours; wet, dusty or large-area work is better zoned or done overnight. Night work requires dust and noise controls, finished-work protection and zone isolation, and adds cost and calendar time. Malls additionally need property coordination and access permits.
When can the space be used again, and will there be an odour?
Water-based acrylic murals and water-based clear coats are touch-dry quickly and usually low odour: the area can normally be walked through the same day and is largely odour-free after two to three days of ventilation. Processes involving solvent paints, adhesives or resins need longer ventilation and curing; use low-odour materials and test reports for children's or healthcare spaces. We do not make unverifiable zero-emission claims - the test report is the reference.
What if the programme slips?
Prevention is contractual: state start and completion dates, the conditions that justify an extension (weather, approvals, client-side causes, material delivery), and the liability for a contractor-caused delay. Any change affecting the programme - a variation, a client design change, inability to access the site - should be recorded in writing at the time. Client-side delay is a valid extension ground, but only when confirmed promptly in writing.
Three ways into the material
Technique articles explain how the work is made. Buyer insights explain how a project is specified, approved and accepted. The Q&A section answers the questions that come up before a quotation is agreed.
Technical knowledge base
22 in-depth articles on materials, processes, installation QA and applications.
Open section →Buyer insights
7 long-form guides on contracts, site access, acceptance, briefing and aftercare.
Open section →Tell us what you are building
Send photos, dimensions, the destination country and your target date. You will get a technique recommendation, a reference price band and a production schedule - no obligation.
Request a quoteHow export works