About the figures on this page. Prices on this page are reference ranges for projects delivered inside China, shown in CNY. Export projects are quoted individually in USD after the brief, site conditions, freight and installation scope are confirmed. All ranges are indicative, not a fixed rate, and no outcome or exposure is promised.
Site surveys and difficult substrates
What to photograph, when a wall must be stripped back, how high or curved spaces change the method, and what the site must provide. Twelve site questions.
Can I get a quote without dimensions?
You can get a range, not a firm price - without dimensions, material quantities and programme cannot be calculated, and a single number would only create a later dispute. To narrow the range, give approximate dimensions (even 'about four metres wide by three high'), the intended use, the feeling you want, and a few site photographs. The final price follows a site re-measure.
How should I photograph a site so the assessment is accurate?
Four standard shots: a straight-on full view from about three metres that includes the entire wall, a 45-degree view from the left, the same from the right, and a close-up of the wall material with a ruler or bottle for scale. Add the power outlets, the ceiling (luminaires, sprinklers), the floor, and close-ups of any defects or pipework. A short ten-second walk-around video helps convey spatial relationships; if photographs are difficult, arrange a site visit or a live video call.
Can a bare concrete wall be painted directly?
Usually yes, but only after preparation. Bare cement and concrete are absorbent and alkaline, so direct colour application causes patchiness and alkali bloom: apply an alkali-resistant sealing primer, a thin skim coat, allow it to dry fully, then paint. If the base is sandy, hollow, cracked or damp, repair it and eliminate the water source first. Fresh plaster should cure for several weeks depending on thickness and weather.
How should an old wall be prepared for refurbishment?
First decide whether it can be overcoated: a sound, level, hollow-free, dry wall can be cleaned and covered. Peeling, chalking, hollow areas, mould or water ingress mean stripping back and rebuilding the substrate. The sequence is to remove loose layers, repair cracks, apply a damp-proof or alkali-resistant primer, level, then finish. Localised stripping is acceptable where hollow areas are confined - it balances cost and quality.
Does an old shop refit require stripping everything back?
Follow the substrate. If the existing finish is sound, level, dry and compatible with the new system, overcoating is fastest and cheapest. Hollow plaster, peeling, chalking, mould, leaks, or an incompatible old finish (for example an oil-based paint under a water-based system) require removal. Covering a failing base simply lets the problem develop underneath. Zoned and night work can keep trading disruption low.
What changes when the ceiling is very high?
Above roughly four metres, plan scaffolding or an access platform as a separate cost and programme item, and confirm hanger points and load capacity for anything suspended. Design for long viewing distances: fine detail cannot be read up high, so overall proportion and colour matter more, and luminaires and access hatches must be planned in advance. Access costs can be a meaningful share of the total and should be listed separately in the quotation.
How should pipes, sprinklers and detectors be handled?
The rule is: enclose what can be enclosed, leave an access hatch, and never move or obscure fire services. Sprinkler heads, smoke detectors and exit signs have code-defined positions and clearances, and the site operator or fire authority decides compliance. Pipes can be encased in gypsum or cement relief and turned into a design feature, screened with a decorative or perforated panel, or absorbed into the wall composition. Access hatches at valves and junctions are worth specifying.
Can balconies and external facades be treated, and how is waterproofing handled?
Yes, but treat them as semi-external or external: select weather-resistant materials, add an anti-UV topcoat and detail for water. On balconies, solve water first - drainage falls, floor drains, waterproofing at wall-floor junctions - because leaks destroy the finish quickly. Facades need to handle sun, wind-driven rain, thermal cycling and future cleaning. External facades commonly need property or authority approval, so confirm before design.
Can sloped or curved walls be worked on?
Yes - curved and irregular surfaces are where relief, GRG and 3D printing perform best. GRG can be cast to large radii, relief can be modelled directly to follow the surface, and printing produces irregular components; flat panel cladding is unsuitable for a tight curve. Confirm the radius, the wall's condition and any cracking or damp first; the smaller the radius, the more demanding the process. Expect a premium over flat work, and specify GRC or another weather-resistant system outdoors.
What works on supermarket and training-centre walls?
Zone the space and design for high-frequency contact. In a supermarket, put a thematic visual at the entrance, keep shelf aisles simple, washable and impact-resistant, and use the checkout area for a brand wall. In a training centre, prioritise low emissions, impact safety, washability and imagery that expresses the teaching approach, while keeping fire exit signage visible. Mall-based units usually need property and fire notification; standalone premises follow local requirements.
What does the site need to provide for the works?
Three things: workable access and circulation (material delivery, space for scaffolding or a platform, confirmed lift and corridor sizes); temporary power and water with adequate capacity; and ventilation with manageable temperature and humidity. Cold, humid or rainy conditions slow the drying of water-based materials and the curing of cement, so allow programme time; dehumidifiers or heating may be needed indoors.
What if the site has no power or water?
This is a normal preparation item, not a blocker. Most processes (grinding, lighting, compressors, printing equipment) need temporary power, supplied by an approved temporary feed, a generator or a nearby connection with capacity confirmed in advance. Water for cleaning and mixing can be brought in or connected from an adjacent source, with wastewater handled to property requirements. Temporary services and connection costs are listed separately in the quotation; all wiring must be installed safely with earth and moisture protection.
Three ways into the material
Technique articles explain how the work is made. Buyer insights explain how a project is specified, approved and accepted. The Q&A section answers the questions that come up before a quotation is agreed.
Technical knowledge base
22 in-depth articles on materials, processes, installation QA and applications.
Open section →Buyer insights
7 long-form guides on contracts, site access, acceptance, briefing and aftercare.
Open section →Tell us what you are building
Send photos, dimensions, the destination country and your target date. You will get a technique recommendation, a reference price band and a production schedule - no obligation.
Request a quoteHow export works