About the figures on this page. Prices on this page are reference ranges for projects delivered inside China, shown in CNY. Export projects are quoted individually in USD after the brief, site conditions, freight and installation scope are confirmed. All ranges are indicative, not a fixed rate, and no outcome or exposure is promised.

12 questions

Avoiding common problems

The recurring traps in bespoke fit-out work and how to close them with contract wording and records. Twelve risk questions.

What are the most common construction pitfalls?

Five recur: skipping substrate preparation so the finish peels months later; a low quote with missing items followed by add-ons; substituted or downgraded materials; a verbally promised programme that keeps slipping; and a small crew with no aftercare once the job is done. The defence is contract wording plus evidence: specify material models, programme milestones, acceptance criteria and warranty scope, photograph key stages, and confirm every change in writing.

How can I judge whether a contractor is reliable?

Four signals: an itemised quote, proactive mention of risks, verifiable case studies and a stable legal entity, and a willingness to write the warranty into the contract. A reliable contractor will point out substrate problems before being asked. Warning signs are a single lump-sum total, evasion of direct questions, pressure for a large immediate deposit, claims that anything is possible at well below market rates, and refusal to disclose material information.

Which clauses must be in the contract?

Six: scope included and excluded; brand and model of main materials; programme and extension conditions; acceptance standard and rectification; written confirmation before variations; and warranty period, scope and response time. Also add payment milestones, safety responsibility, ownership of design work and dispute resolution. Corporate contracts need a company seal; individuals should sign and leave identification details. Verbal promises are hard to prove later.

How do I spot missing items in a quotation?

Check six lines - design, main materials, auxiliary materials, labour and construction, freight and installation, tax - plus the warranty period. Anything unstated should be treated as excluded and queried. Pay particular attention to site measures: scaffolding for high-level work, finished-work protection, night working and waste removal are the most frequently omitted. Confirm whether tax is included and who handles waste removal.

What should be checked on site before work starts?

Five groups: dimensions and substrate (wall and floor material, flatness, moisture); structure and safety (can it be drilled, is it load-bearing, where are services); electrical and lighting (capacity, cable routes, luminaire positions); fire and approvals (property requirements, sprinklers, detectors); and delivery access (lift dimensions, unloading, working window). These determine method, price and programme - record them with photographs and a scale reference, and ideally a site re-measure.

Does this project need formal approval?

Three cases: no approval for decorative work in an owned space that touches neither structure nor fire systems; property consent for malls and offices (renderings, method statement, working hours submitted); and formal approval where structure, fire systems, outdoor advertising or public space are involved. Submission packs commonly include renderings, a method statement, material test reports, qualifications and a temporary power request. Timelines range from days to weeks, so submit early.

What permits are needed for mall work?

Typically an access application and work permits, submission of the scheme and renderings, a temporary power application, fire approval (especially for suspended work, power and combustible materials), a night-work permit, and crew insurance plus a safety briefing. Suspended atrium work also needs a load calculation and property-approved hanger positions. A supplier can help prepare the pack, but the mall, property team and fire authority are the approving bodies.

How do I prevent price increases during construction?

Three steps: write the triggers and pricing basis for variations into the contract before signing; confirm substrate, access measures and night-work factors before mobilisation to reduce surprises; and require written confirmation of cost and programme impact for every change during the work. Substrate problems and site measure fees are the main sources of add-ons, so inspect the site carefully and clarify what is included.

How do I stop materials being swapped for cheaper ones?

Three measures: name brand, model and specification of main materials in the contract; inspect and retain a sample or photograph on delivery; and photograph key stages (substrate, armature, finish). Corporate projects can additionally require material test reports and certificates as acceptance evidence. If a specific brand is not required, at least specify equivalent grade and specification so the material cannot be quietly downgraded. Label and jointly sign retained samples.

Is an abnormally low bid a concern?

Usually yes. Very low bids typically come from missing scope, downgraded materials or simplified methods, all of which surface later. Align all bids against one enquiry list, see what the lowest is missing, then ask for material models and method descriptions in writing. A small number of efficient teams genuinely achieve lower costs through scale, but verify their case studies and delivery capacity. Protect yourself with clear scope, materials, liability and warranty terms plus a retained final payment.

Who carries safety responsibility on site?

State it in the contract: the contractor is responsible for its own personnel and construction operations; the client provides a workable site and discloses structural, electrical and fire information truthfully. Work at height, temporary power and hot work require certified operators and appropriate insurance, and malls usually require insurance plus a safety briefing. Insurance is strongly recommended and often mandatory on larger or mall projects; post-incident liability follows the contract and legal determination.

How do I avoid a contractor abandoning the job?

Four measures: choose a team with a stable registered entity and verifiable projects; pay in stages rather than one large deposit; retain 10-20 percent until acceptance; and use a proper contract with an invoice and traceable payment to a corporate account. Be cautious of bids far below market, urgent payment demands, refusal to sign a contract or refusal to invoice. Contracts and staged payment greatly reduce the risk but do not eliminate it - selecting the right team still matters most.

Also in the library

Three ways into the material

Technique articles explain how the work is made. Buyer insights explain how a project is specified, approved and accepted. The Q&A section answers the questions that come up before a quotation is agreed.

Technical knowledge base

22 in-depth articles on materials, processes, installation QA and applications.

Open section →

Buyer insights

7 long-form guides on contracts, site access, acceptance, briefing and aftercare.

Open section →

Buyer Q&A

96 practical answers grouped into 8 themes.