About the figures on this page. Prices on this page are reference ranges for projects delivered inside China, shown in CNY. Export projects are quoted individually in USD after the brief, site conditions, freight and installation scope are confirmed. All ranges are indicative, not a fixed rate, and no outcome or exposure is promised.
Briefs, contracts and paperwork
How to write a brief, read a quotation, structure payment and keep the records that make later maintenance easy. Twelve documentation questions.
How do I fill in a project enquiry?
Four items are enough: what kind of space, approximate size, budget range, and the feeling you want; add one line on what worries you most. Photographs help most: a front full view, left and right 45-degree views, close-ups of defects or pipework, and ideally a ruler or bottle in frame for scale. Exact dimensions are not needed at this stage - a site survey will confirm them later.
How should a proposal document be structured for a client review?
Eight sections work reliably: project understanding, design approach, method and materials, construction organisation and programme, quality and safety, deliverables and acceptance, indicative budget range, and next steps requiring client input. Use language the reader can picture for the design section, and follow every technical term with a plain-language explanation. Keep the main text focused - roughly 400-700 words - and attach a rendering for the key scheme.
How do I write an acceptance checklist?
Organise it into six groups - appearance and effect, workmanship and detail, structure and safety, electrical and lighting, emissions and odour, and site cleanliness - with three to six lines in each. Write every line as 'what to check plus how to check it' (look, touch, measure, power on, tap lightly), and avoid unmeasurable phrases such as 'looks good'. The result should be a sheet someone can physically tick on site.
How do I estimate a material schedule?
List by build-up: substrate preparation materials, main material, auxiliary materials, fixings, finish coats and protection, with roughly ten percent wastage. Keep descriptions generic - gypsum powder, GRC components, water-based clear coat - rather than brand-specific, since the schedule is for comparison and procurement planning. Actual quantities follow site setting-out and the manufacturer's yield, so treat the schedule as an estimate and use it to make competing quotes comparable.
What is needed for a tender submission?
The baseline pack is business registration and qualifications, comparable project case studies, a technical proposal, a detailed price breakdown, programme and warranty commitments, safety and insurance documents, and a legal representative authorisation. Missing one item can invalidate a bid, so check the tender type and adjust. A technical proposal usually runs to seven to nine first-level headings covering understanding, design, method, organisation, quality and safety, programme, service and pricing notes.
Which contract clauses should I check before signing?
Six essentials: what the price includes and excludes; brand and model of main materials; programme and extension conditions; acceptance standard and rectification process; written confirmation before any variation starts; and warranty period, scope and response time. Add payment milestones and proportions, safety responsibility allocation, ownership of design work, and dispute resolution. Put verbal promises in writing - they are almost impossible to evidence later.
How do I read a quotation without being disadvantaged?
Look at three things before the total: is it itemised, does it name materials and methods, and are exclusions listed? A proper quote has line items with unit rate, quantity and subtotal, not one lump sum. Then check that the material model, method, and the inclusion of design, freight, installation, tax and warranty are stated - anything unstated should be queried. Compare two or three quotes against the same enquiry list.
What is a sensible payment structure?
Tie payment to progress: a deposit to reserve the slot and procure materials, a production or mobilisation stage payment, and a final payment after acceptance. Holding 10-20 percent until acceptance is common and preserves a quality lever. Avoid both full payment upfront and a structure with almost no retention - extremes at either end tend to hurt quality. The deposit is often around 30 percent, and the final payment follows acceptance, completed rectifications and document handover.
How should handover and acceptance be run?
Walk the acceptance checklist item by item on the day: appearance, detail, fixings, lighting powered on, odour and site cleanliness. Check lit work in both daylight and switched-on night conditions, and test fixings by pulling and tapping lightly. Record problems in writing with photographs and a rectification deadline, then re-inspect. Retain completion photographs, material test reports, the warranty card and contact details.
How should a warranty clause be written?
State three things: how long, what is covered and what is excluded. A common domestic baseline is one year for the whole installation, free repair of non-human-caused defects, and a response within 48 hours. List exclusions explicitly - human damage, impact, unauthorised modification, force majeure and failure to follow care instructions. Non-human-caused repairs are free; human damage is chargeable at cost, with the cause confirmed on site by photographs before responsibility is assigned.
How are mid-project variations settled?
The proper sequence: identify the need, explain the reason in writing, state the cost and the effect on the programme, obtain written client confirmation, then carry out the work. A verbal go-ahead - even a short message without a figure - is the most common source of disputes, so the confirmation must include both scope and amount. Do not start before confirmation; it protects both parties.
Which records should be kept after completion?
Keep shop drawings and renderings, the main material schedule with test reports, the acceptance checklist and record, completion photographs, the warranty card, and notes describing concealed electrical and structural work. Corporate projects should also retain the contract, payment records and invoices for audit. These documents make later maintenance and a future refit far easier - especially the drawings where holes, cable routes and load-bearing elements were located.
Three ways into the material
Technique articles explain how the work is made. Buyer insights explain how a project is specified, approved and accepted. The Q&A section answers the questions that come up before a quotation is agreed.
Technical knowledge base
22 in-depth articles on materials, processes, installation QA and applications.
Open section →Buyer insights
7 long-form guides on contracts, site access, acceptance, briefing and aftercare.