Buyer Q&A

Pricing and budgets

How bespoke work is priced, what moves a quote up or down, and where extra charges usually appear. Twelve questions buyers ask before a budget is agreed.

About the figures on this page. Prices on this page are reference ranges for projects delivered inside China, shown in CNY. Export projects are quoted individually in USD after the brief, site conditions, freight and installation scope are confirmed. All ranges are indicative, not a fixed rate, and no outcome or exposure is promised.

12 questions

Pricing and budgets

How bespoke work is priced, what moves a quote up or down, and where extra charges usually appear. Twelve questions buyers ask before a budget is agreed.

How much does a relief panel cost per square metre?

As a China-domestic reference, gypsum relief is CNY 500-1,600 per square metre and cement/GRC relief CNY 600-1,800, with the ranges overlapping. Three things set the number: how complex the form is, whether the substrate needs preparation, and how large the area is. More depth and finer detail mean more modelling and mould work; a bare or old wall is priced separately; small areas carry a higher unit cost because the same sequence is spread over less area.

How much does a mural cost per square metre?

Hand-painted work is roughly CNY 150-600 per square metre; printed routes are lower. The spread comes from method: flat colour-block graphics sit at the low end, while realistic figures, landscapes and multi-layer glazing sit at the high end. Area, substrate condition, working height (scaffolding or access platforms), rush scheduling and exterior UV topcoats all move the figure.

How much more expensive is cement relief than gypsum relief?

For the same specification, cement or GRC relief is usually about 10-30 percent higher, because it needs reinforcement, is heavier and takes more labour - but the two ranges overlap. They also serve different conditions: gypsum is fine, white and moisture-sensitive, so it belongs indoors; cement is tough, weather-resistant and handles outdoor or large-scale work. Using gypsum outdoors to save money usually costs more in rework within a couple of seasons.

What does a small 3D-printed piece cost?

Small printed objects and collectibles start around CNY 80 each. Pricing follows three inputs: volume (material used), material grade (PLA, resin, nylon differ considerably) and finishing (sanding, priming, painting, assembly). A common comparison mistake is asking only for the price per piece: a 15 cm model with visible layer lines and the same model sanded and finished can differ by roughly a factor of two.

What does a mall display installation cost?

Mall displays are priced as a set, not per square metre, with a China-domestic reference of CNY 20,000-150,000 per installation. The three biggest drivers are scale (an atrium suspension versus a floor feature), structure (armature, hangers, load calculations) and lighting or interactivity. Mall work also carries approval, night-work and permit costs, and pre-holiday capacity is tight, so both price and lead time rise in peak season.

What is the typical price range for a sculpture?

Sculpture has the widest spread of any category, roughly CNY 8,000-150,000 per piece, because a half-metre object and a five-metre landmark are different orders of magnitude. Material (FRP is economical, stainless steel mid-range, cast bronze higher, stone heavy), size, and process difficulty (mirror polishing, piercing, realism) set the level. For outdoor work, also count the foundation, lifting, corrosion protection and freight - these invisible items can exceed a third of the total.

What can be done with a budget of CNY 10,000?

As a domestic reference, CNY 10,000 covers about 15-40 square metres of hand-painted mural, a 5-10 square metre gypsum relief feature wall, or one small retail display set. With a limited budget, concentrating on one focal wall outperforms spreading the same money thinly across a whole space: the wall visitors see first and photograph most is the one worth doing properly.

Why do quotes for the same project differ so much?

A twofold difference usually means two different scopes, not a pricing attitude. Check whether design, transport, installation, high-level access measures, warranty period and tax are included, and what grade of main material is specified. Split both quotes into unit rate times quantity, plus site measures, plus other items, and align them line by line; the gap usually narrows. A lump-sum quote missing items is often more expensive once variations begin.

Where do unexpected charges appear during a project?

Three places dominate: substrate remediation (hollow areas, leaks, removing old finishes, usually only discovered after access), high-level access (scaffolding or platforms above roughly four metres), and night work, rush scheduling or unusually complex forms. The defence is not negotiating harder but agreeing in writing before work starts which conditions count as a variation, how variations are priced, and what the unit rates are.

What does a corporate feature wall cost?

For a 10-20 square metre wall, a China-domestic reference is CNY 8,000-30,000, depending on whether it is printed or wallcovered, hand-painted, or a combination of dimensional lettering, relief and lightboxes. The main cost blocks are artwork development, materials (coating, board, letters, LED strip) and installation including concealed wiring. Drilling into structural walls or hiding cable routes increases the installation share.

What do rural mural programmes cost per square metre?

Rural programmes are typically large in area and tight in budget, so the mainstream approach is broad printed coverage with hand-painted focal walls, at roughly CNY 80-300 per square metre, with lower unit rates for continuous runs. Cost depends on whether walls are clustered (scattered sites add transport and scaffolding), wall condition, image complexity, and whether the programme must finish before an inspection or festival.

Are design and installation included in a quote?

A proper quote is itemised: design, main materials, auxiliary materials, labour and construction, freight and installation, and a contingency line - plus the warranty period. Anything not written down should be assumed excluded and queried. Our own practice is that initial consultation and a budget quotation carry no fee, and materials, method and programme are written into the quote before signing so there are no hidden additions.

Also in the library

Three ways into the material

Technique articles explain how the work is made. Buyer insights explain how a project is specified, approved and accepted. The Q&A section answers the questions that come up before a quotation is agreed.

Technical knowledge base

22 in-depth articles on materials, processes, installation QA and applications.

Open section →

Buyer insights

7 long-form guides on contracts, site access, acceptance, briefing and aftercare.

Open section →

Buyer Q&A

96 practical answers grouped into 8 themes.

Open section →

Tell us what you are building

Send photos, dimensions, the destination country and your target date. You will get a technique recommendation, a reference price band and a production schedule - no obligation.

Request a quoteHow export works