Installing Large Relief Panels: A Site-Ready Sequence

From substrate check to final joint treatment, the sequence we hand to local installation crews on export projects.

Installing Large Relief Panels: A Site-Ready Sequence

From substrate check to final joint treatment, the sequence we hand to local installation crews on export projects.

1. Check the substrate first

Confirm flatness, load capacity and moisture before crates leave the warehouse. Most on-site problems are substrate problems discovered too late.

2. Set out from a datum line

Mark the datum and panel grid from the approved shop drawing. Panels are numbered; install in that order rather than working from the most convenient edge.

3. Dry-fit before fixing

Place a full row without adhesive or final fixings. Joint lines and the relief narrative are checked at this stage, while everything is still movable.

4. Fix anchors, not panels

Anchors go into structure, not into plasterboard. Use the supplied anchor schedule and torque values; never substitute fasteners on site without approval.

5. Treat joints last

Joint compound, touching-up paint and protective coating are applied after all mechanical fixing is complete and the wall has been cleaned.

Working with us
Every project ships with shop drawings, a numbered crate list and a maintenance note. If your brief needs a different document set, tell us at enquiry stage.

Related reading

Talk to the workshop

Send an enquiry →

Need this applied to your project?

Send the brief and the destination. We will return a technique recommendation, a document list and a production schedule.

Request a quoteHow export works