Exhibition & Event Build
An exhibition build is three days of show behind thirty days of engineering. We produce modular stands, museum display cases, launch sets and temporary pavilions with pre-assembly in our workshop before anything ships.
Trial assembly is standard: every module is fitted, photographed and labelled in Shanghai, then repacked in the order the venue crew will need it. That removes most on-site surprises.
What we deliver
- Workshop trial assembly with photographic record
- Modular frames that break down for air or sea freight
- Venue-compliant material and fire documentation on request
- Integrated AV, lighting and graphic mounting
- Reusable kit for a travelling exhibition programme

Typical specification
| Lead time | 25 - 45 working days |
|---|---|
| Build on site | 1 - 4 days depending on stand size |
| Packing | Flight cases or export crates, numbered |
Questions on this capability
Do you handle venue paperwork?
We supply material specifications, drawings and load data; the exhibitor or local contractor files them with the venue.
Can the stand travel to several cities?
Yes, with a reusable frame and replaceable graphic skins designed at concept stage.
Where this is used
Hotels & Resorts
Lobby relief walls, sculptures and wayfinding built to a fixed opening date, with documentation that a hotel engineering team can maintain for years.
View solution →Retail & Flagship Stores
Window schemes, in-store installations and brand reliefs that can be rolled out across multiple stores from one set of masters.
View solution →Shopping Malls & Atriums
Large-scale hanging installations, atrium centrepieces and seasonal campaigns engineered for malls with strict load, fire and access rules.
View solution →Planning a exhibition & event build project?
Send your drawings, site photographs and the destination country. We will come back with a technique recommendation, a reference band and a production schedule.
Request a quoteHow export works